Tuesday, January 22, 2008

We are officially moved in to our new house. It took some pushing, but we moved in on Dec. 15. There are still a few things some subcontractors have to come back and do (like some painting on the exterior -- it'll have to wait for warmer weather), but we were determined to get in before the holidays.

Of course, we happened to pick the nastiest day of 2007! The morning started with snowy roads, making the route of the first few trucks treacherous. Then it changed to freezing rain and then a soaking, cold rain. All of our furniture and boxes got wet and had to be dried off as they came in the house. And the friends and family who helped us load and unload the trucks were soaked and frozen to the bone. Then when it was finally time to come in and eat a warm lunch, our power went out! Luckily we have a gas fireplace which helped them thaw out a little bit. Thanks again to all our movers -- we owe you! Wouldn't you know that that next Saturday was 55 degrees and sunny?

Words can't express how happy we are to be here. It really feels like home. Once we got through the holidays, we found that our weekends are free again and we can catch up on those crossword puzzles that had been piling up since October. We still have some small things to get done, so we try to do a little here and there, but there's no more stress.

We have already hosted a couple gatherings and have had a few people come over for tours. We are hoping to host an open house in the spring so that more of our friends and family can stop by and visit. By then hopefully we'll have some grass grown and some landscape plants in. Right now I'm enjoying looking out our windows at the trees covered with snow!

The photo above shows our kitchen. I have been promising that photo for some time now! If you'd like to see what the rest of the house looks like now that it's finished, click here and then click on "View Slideshow."

Thursday, November 29, 2007

We're Almost There

We haven't done many blog entries lately, partly because things are going a bit slower than we'd like, and partly because we've just been crazy busy. We are not very familiar with a good night's sleep these days and will be glad when it's all over with and we can sit down and do a crossword puzzle again, instead of having to discuss shower doors or tiles or where all of our money is going (eek!) until the wee hours each night.

The good news is that we have settled on December 15 as our move-in date. You may know that we had asked Mark (builder) to get us in by the end of November. He always just grinned at us when we would ask how we were doing to hit that date. Finally he admitted November was a bust, and said, "We'll get you in before Christmas." Great. Well, we moved into our Sellersburg house the week before Christmas, so why not do it again? Mark is pushing the crews to get everything wrapped up, but apparently all the subs are really busy right now, so there will be a few things that will be finished up after we move in (like maybe even our master shower doors!).

Since our last entry, the trim carpenters finished installing the window trim, baseboards, door trim and the stairway treads and railing. They are still waiting to build our fireplace mantle until we get the tile laid (that's another story). The painters took over as of last weekend. So far they had prepped and painted all the trim and doors (bright white to match the cabinets) and have put the first coat of paint on the main rooms (Benjamin Moore's Ashley Grey). The laundry room also has the first coat (Benjamin Moore's Nantucket Fog). By next Wednesday, they should be finished on the inside so that the hardwood floor guys can come back to sand and stain.

On the outside of the house, our porch columns were finally completed, the dirt was leveled and graded and the driveway was poured. It's nice not to have to put on old shoes just to walk into the house any more. I don't miss the gravel and mud mix! Unfortunately we missed the window for planting grass seed, so the yard will be dirt until the spring, but at least we don't have to walk in it.

We've been putting in a little sweat equity ourselves (I stress "little"). Keep in mind that Jason and I are not the most handy people. We decided to install all the closet shelving on our own, so we've measured and re-measured, and installed the first one in our laundry room closet, which is the simplest, just to make sure we knew what we were doing. It went well until we were trying to drill the side wall bracket on and we hit what turned out to be a heating duct. So we will be reviewing our pre-drywall photos before we do any more installation! We are actually eager to tackle the rest of the closets, but we've been waiting on the painters to get finished so we don't put the shelving right in the way of their painting.

We also installed all of our hardware on our cabinets in the kitchen and bathrooms. The polished nickel hardware in the kitchen really looks great with the white cabinets and the gray and white Carrara marble countertops. Jason and Mike still have to come back to finish installing the trim and to putty/caulk, so the cabinets still are not complete! We've asked our tile guy to come back and do the subway tile backsplash (same as the master shower) for us in the kitchen. We had planned on doing it ourselves, but since it's right in the most prominent room of the house, we're afraid to use that as our first-ever tiling project.

I have been doing lots of shopping for curtains, decor, sofas and occasional chairs. In turn, Jason (ever the pessimist) has been doing lots of freaking out over our dwindling bank account. Christmas shopping has certainly not been helping things! The good thing about changing to an entirely different color scheme from what we used to have is that I have an excuse to do two of my favorite things -- shop and decorate! The bad thing is that it costs money to shop and decorate. What a drag! Whose idea was that, anyway? Mr. Money-Watcher has put a temporary hold on my spending until we get the mortgage finalized and know that we can actually afford to live in this house we've been putting all this work into! Okay, I guess everything doesn't have to be perfectly set up just after we move in. Maybe a couple weeks after we move in will be fine (ha ha).

Friday, November 9, 2007

Live from Cincinnati...

Hollie and I are in Cincinnati this weekend for the Xavier University National Alumni Annual Meeting (she's the Louisville chapter president -- I'm just along for the free mini-vacation). Tomorrow is Xavier's Men's Basketball season opener...but I digress.

Lots to report in the past couple of weeks. First up is the cabinets, which my brother, stepfather, and I installed two weekends ago. The countertop was on by the following Wednesday (for some reason we don't have a pic including the countertop). I admit that I have yet to attach the hardware as well, so I promise to post an update when the kitchen is more complete.

Last weekend Hollie, Zachary, and I got some assistance with the medicine cabinets that will hang in the master bathroom. We bought them unassembled, so we had to build them and then stain them to match the cabinetry that will be in the master bath. Here you can see Zachary really getting into it. :)

We were pleasantly surprised to see our new mailbox completed on Thursday afternoon. We had it built to the same specifications as the 4 piers supporting the roof on the front porch of the house. It will be capped with limestone as a finishing touch.

And finally, this past week, the big transformation has been with the interior trim. The crew hung all the interior doors (in just 2 days) and has just completed the trim around the doors and windows.Next week, the baseboard will be installed and the stair treads, balusters, and newel post will be started.

Gotta rest up for the game, so I'm off to bed....












Saturday, October 27, 2007

Locking Up

We are now at the point where we're locking up the house. Last week the wood floors were put in -- in one day! They are not the pre-finished type, so they will be sanded and stained on-site just before the house is ready to move in to. Little white hexagon tiles (3/4") are being laid in the bathrooms and laundry room, and I'm really excited about those. They are very "period." Our master shower is also being crafted with 3x6-inch white subway tiles (see photo), and eventually our kitchen backsplash will have those too.

On the outside of the house, trenches are being dug and utility lines are being laid. Unfortunately this past week has been a bit of a wash on that, though, because it's been raining almost the whole week. The good news on the rain is that our creek now has a bit of water in it again!

The most noticeable addition to the exterior, besides the siding being finished, is the garage doors. The style of the garage door panels and windows coordinates with our front door (would you expect anything less?). The three-lite pattern of the window panes also coordinates with the windows on the house. The white parts of the garage doors will be painted green to match the siding. I believe the painter is supposed to be back soon to paint the rest of the exterior.

Another addition to the outside of the house is the back deck. We were planning to add that on down the road, but because the back yard is such a slope, and because we'd have to build some sort of steps off the back door anyway, we decided to go ahead and do it. In the photo, you can see that surrounding the deck is trees that have just started turning colors for fall.

Last night we hosted the monthly Young family (my mom's side) poker game for the last time at the rental house. Several people met me beforehand at the new house for a pre-game tour. The first comment from my grandpa, ever the cynic, was, "How many people are going to live in this house? Forty-seven?" Gotta love him. :)

Jason, Mike (Jason's brother/cabinet guy) and Allen (Jason's step-dad) are busily installing the cabinets in the kitchen, master bathroom and upstairs bathroom this weekend. We'll try to get a blog entry up showing the cabinets by early next week.

Sunday, October 7, 2007

Siding is going up

The same Amish crew that did our framing is now installing the siding and exterior wall trim. In the photo, you can see the green siding on the house and the cedar shingles in the gables.

On the inside, drywall was installed, mudded and sanded. It's amazing how much bigger the rooms look now that they are defined by walls. The painters took a first pass at the inside, priming the walls and ceilings. The primer was tinted to match the colors we chose for the walls, which is nice because we have a preview of the painted walls before we are committed. There is just one color we might tweak, which is the one that will be in all the main rooms on the first and second floors. (Does anyone besides me know the difference between brownish-gray and grayish-brown?)

The front door was installed late this week. It is very much Craftsman-style, with the divided lights at the top, the dentil "drip mold" ledge, and the vertical panels at the bottom. It will eventually be stained a medium brown color.

Because our lot is so sloped, we had to bring in loads of dirt to fill in around the house and to help direct the flow of water from the field uphill from our lot, so that it doesn't run right toward the house.

Lastly, kudos to Jason and his dad for sweating it out yesterday (literally -- it was 92 degrees on Oct.6!) to saw down a 40"-45" wide tree that had been hit by lightning and had become an eyesore. They also cleared out some brush out by the street to make room for our mailbox.

Coming attractions: Installing the unfinished hardwood floors and the tile in the bathrooms and laundry room.

Saturday, September 22, 2007

Brickers, Insulators, Drywallers, and Septic


I've been reluctant to post any new pictures of the front facade of the house, mostly because the "front yard" is a junk pile. However, I'm so thrilled with our Craftsman-style brick piers (i.e. columns) that I had to snap a photo. The Amish masons did a fantastic job, and they are fast!! They bricked the entire skirt, the chimney (wow, what a ton of bricks!), and the piers in just a little over a week.

The initial insulation has also been completed this week. Hollie and I chose to go with foam insulation that gets blown in over traditional fiberglass insulation. The upfront costs are a little higher, but everyone (and I mean everyone -- even the plumber!) says this will be the best long-term investment we could have made over the life of the house. The insulator estimated our monthly utility bill at $60 or less.

The insulation installation process (say that 5 times fast) is pretty interesting. After initial sealing of the windows and other small cracks, the foam is blown in with a long tube from the truck. It then expands and fills in all possible voids within the walls and/or rafters. After the drying process, the guys come back with a large tool that scrapes the walls smooth so that the drywall attaches over the studs.

We should have drywall hung by early next week, at the latest. I expect that to have a huge impact, as rooms will be defined three-dimensionally for the first time. That is huge for me, as I think I was born without a right brain (that's right as in direction not as in sanity :) ).

And the dirtiest job of the week goes to Jerry, the guy who dug into bedrock to gingerly place two concrete tanks underground for the septic system. He also installed the lateral field in a...well, field...that sits just above the house. I can't see any of it of course, because he worked so fast it was all buried before I got there. I guess I'll have to take his word that it's all done. If it's not, I think we'll know pretty quickly. :)

Thursday, September 13, 2007

All Stacked Up

The Amish masons are the newest crew at the house. So far they've completed the retaining wall, the basement walkout, and they're two-thirds of the way up the chimney. If you've seen our house on the lot, you know how high off the ground the top of the chimney is. If you haven't, it's over three stories up because it's on the walkout side of the house, and it extends up even with the peak of our highest roofline. Let's just say we're glad they're not afraid to climb the scaffolding and balance up there for hours on end while placing bricks and mortar!

We chose the brick several months ago after reviewing samples the size of a placemat. Luckily we picked out a winner! Our brick is the Catawba Vista design by Hanson Brick, which has a mix of several muted colors. It's made to look old, because the edges are rough and the surface has bumps, rather than a smooth, even finish. We also chose buff mortar instead of the standard gray, because buff is more "period." I don't think anyone could say that Jason or I pick anything on a whim -- everything is chosen for a specific reason!


Other happenings around the house: shingles on the roof, a newly-poured concrete garage floor and the first steps toward insulation.

Coming up: expert masonry skills will be used to create our tapered porch columns. We can't wait -- those columns will really define the look of the front of the house.